Compliance Emission Testing of the Central Heating and Power Plant, Eielson Air Force Base, Alaska

Abstract

Compliance emission testing for particulate matter and visible emissions was conducted on Boiler 3 at the Eielson AFB Central Heat and Power Plant. Compliance standards are found in Operating Permit No. 9331-AA001, issued by the State of Alaska on 30 April 1993. Initial testing was performed on 11 May 1993. Results from this test indicated that Boiler 3 met the standard for visible emissions but was above the standard for particulate matter emissions. Operating parameters were adjusted and Boiler 3 was retested on 13 May 93. Results from the 13 May test indicated that all emission standards were met. Particulate matter, Visible emissions, Eielson AFB, Central heat and power plant, Compliance emission testing.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1993
Accession Number
ADA276057

Entities

People

  • Robert J. O'brien

Organizations

  • Armstrong Laboratory

Tags

Communities of Interest

  • Biomedical
  • Energy and Power Technologies
  • Human Systems

DTIC Thesaurus Topics

  • Air Force
  • Air Force Facilities
  • Air Pollutants
  • Air Pollution
  • Chemistry
  • Combustion
  • Dielectric Gases
  • Engineering
  • Flue Gases
  • Materials
  • Materials Laboratories
  • Materials Processing
  • Materials Science
  • Materials Testing
  • Measurement
  • Sulfur Compounds
  • Test Methods

Fields of Study

  • Environmental science
  • Physics

Readers

  • Aerosol Science/Aerosol Physics
  • Energy Conservation and Renewable Energy Engineering.
  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.