Independent Cost Estimate for Full Scale Development and Production of a Future Military Transport Aircraft by Use of the Parametric Model FASTE
Abstract
In 1992 the 'Industrieanlagen - Betriebsgesellschaft' (IABG), Ottobrunn near Munich, was tasked by the German Ministry of Defense (BMVg) with the performance of an independent development and procurement cost estimate for a new military transport aircraft, called 'Future Large Aircraft' (FLA). At this time the FLA program was in the state of pre feasibility studies. Under consideration of the early phase of the project it was decided to make use of the parametric FASTE model which allows project cost estimating even if little detailed information about a project is available. The paper shows the approach chosen by the cost estimators including analysis and preparing of reference data. The basic principle and input parameters of the FASTE model are discussed. Finally the results of trade-off investigations in order to identify the effects of the variation of some key parameters on the expected costs are presented and described.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1993
- Accession Number
- ADA276071
Entities
People
- Peter Teufelhart