Site Plan Safety Submission for Sampling, Monitoring and Decontamination of Mustard Agent, South Plant, Rocky Mountain Arsenal. Volume 1
Abstract
The scope of this site plan safety submission (SPSS) includes: (1) Sampling plan to determine if H is a contaminant in Equipment and piping used in the 1970's for the H DEMIL program; (2) Monitoring plan for personnel involved in the sampling effort; and (3) Decon plan for personnel, equipment, and piping should contamination be identified. Additional sections and appendices include: (1) Historical use of Bld 637 and Bld 538; (2) Chemical information on H, HD, and HT; (3) Safety requirements; (4) Medical requirements and first aid procedures; (5) Piping drawings; and (6) RMA SOP's for sampling, monitoring, and decon.
Document Details
- Document Type
- Technical Report
- Publication Date
- Oct 01, 1988
- Accession Number
- ADA276155
Entities
Organizations
- Tennessee Valley Authority