Hydrazine Blending and Storage Facility, Interim Response Action, Final Implementation Document for Decommissioning, Phase 1
Abstract
The purpose of this final implementation document is to outline the basis and plan for decontamination, dismantlement, and disposal of structures, piping, and equipment at the hydrazine blending and storage facility. The report is divided into the following sections: Introduction - history of the facility, summary of the scope of work, primary objectives of the IRA; Sites inventory- tanks, piping, buildings, asbestos, debris, drums; Plan of action - transfer of untreated wastewater, decontamination, demolition, Transport, and disposal
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 18, 1991
- Accession Number
- ADA279065