A Survey of Construction Management Costs in 1993
Abstract
This report presents the results of the third construction management (CM) cost survey conducted by the Logistics Management Institute. This year's survey was designed so that its findings and conclusions can stand on their own as well as be compared with those of the first and second surveys conducted in 1988 and 1989, respectively. In this introduction, we describe the survey design and then discuss the overall survey responses. The remainder of the report is divided into analyses of general company data, direct and indirect cost data, and individual project data. Finally, we provide an appendix with detailed survey results covering cost management fees and services for 16 construction categories
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 1994
- Accession Number
- ADA283020
Entities
People
- Jeffrey A. Hawkins
- Jordan W. Cassell
Organizations
- LMI