Terminal Doppler Weather Radar Build 5A Operational Test and Evaluation (OT&E) Integration and OT&E Operational Test Plan

Abstract

The Terminal Doppler Weather Radar (TDWR) Build 5A Enhancement Operational Test and Evaluation (OT&E) Integration and OT&E Operational Test Plan provides the overall philosophy and approach to Build 5A OT&E testing, and identifies OT&E objectives responsibilities, and resources. The TDWR Build 5A enhancement provides connectivity to the Low Level Wind Shear Alert System (LLWAS) II to display LLWAS II wind data along with TDWR hazardous weather data on TDWR Geographical Situation Displays (GSD) and Ribbon Display Terminals (RDT) . The TDWR Build 5A OT&E is scheduled to occur at the TDWR site in Memphis, TN, March through May 1994

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jul 01, 1994
Accession Number
ADA283052

Entities

People

  • Donne Wedge
  • Peter Guthlein
  • Radame Martinez
  • Steven Viveiros

Organizations

  • Federal Aviation Administration

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Air Traffic
  • Application Software
  • Computer Programs
  • Computers
  • Detectors
  • Failure Mode And Effect Analysis
  • Maintenance
  • Operating Systems
  • Personnel Management
  • Reliability
  • Simulators
  • Software Development
  • Software Development Tools
  • Test And Evaluation
  • Test Equipment
  • Test Facilities
  • Test Management

Readers

  • Aerospace Test and Evaluation
  • Atmospheric Science/Meteorology