Terminal Doppler Weather Radar Build 5A Operational Test and Evaluation (OT&E) Integration and OT&E Operational Test Plan
Abstract
The Terminal Doppler Weather Radar (TDWR) Build 5A Enhancement Operational Test and Evaluation (OT&E) Integration and OT&E Operational Test Plan provides the overall philosophy and approach to Build 5A OT&E testing, and identifies OT&E objectives responsibilities, and resources. The TDWR Build 5A enhancement provides connectivity to the Low Level Wind Shear Alert System (LLWAS) II to display LLWAS II wind data along with TDWR hazardous weather data on TDWR Geographical Situation Displays (GSD) and Ribbon Display Terminals (RDT) . The TDWR Build 5A OT&E is scheduled to occur at the TDWR site in Memphis, TN, March through May 1994
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 1994
- Accession Number
- ADA283052
Entities
People
- Donne Wedge
- Peter Guthlein
- Radame Martinez
- Steven Viveiros
Organizations
- Federal Aviation Administration