Wastewater Engineering Survey, Rocky Mountain Arsenal, Commerce City, Colorado, 15-29 February 1984
Abstract
The purposes of this survey were to evaluate, identify problems with, and make recommendations to improve: (1) Domestic and industrial wastewater collection; (2) Treatment and disposal systems; (3) Surface and storm water drainage systems; (4) Wastewater laboratory facilities; and (5) Oil and hazardous substances spill control and contingency plans. Major recommendations include: (1) Renovating the IMHOFF tank and implementing proper operating procedures; (2) Determining if the sewage treatment lagoon is a source of DBCP contamination; (3) revising the spill prevention, control, and countermeasures plan (SPCCP); and (4) Revising the installation spill contingency plan (ISCP)
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 01, 1984
- Accession Number
- ADA286151
Entities
People
- Michael F. Laduc
Organizations
- United States Army Medical Command