Final Decision Document for the North Boundary System Improvements, Interim Response Action at the Rocky Mountain Arsenal
Abstract
This interim response action consists of the design and construction or installation of improvements at the north boundary alluvial ground water intercept and treatment system. This draft final decision document provides summaries of: (1) Alternatives considered; (2) Significant events leading to the initiation of the IRA; (3) The ira project; and (4) The applicable or relevant and appropriate requirements, standards, criteria, or limitations (ARAR's) associated with the program. The following improvements are planned: (1) Recharge units in areas not covered by the new recharge trenches; (2) Treatment system modifications to reduce carbon fines in plant effluent; (3) Treatment system modifications to provide greater reliability; and (4) Closure of wells acting as contaminant migration pathways