Rocky Mountain Arsenal, Preliminary Monitoring Plan for Hydrazone Blending Facility
Abstract
The objective of this report is to outline a preliminary plan for monitoring ground water, soil, vegetation, and air in the vincinity of the hydrazine, blending and storage facility (HBSF). The analytes of interest are hydrazine, UDMH and NDMA. Methods for chemical analysis of the above four media are discussed. Results of preliminary sampling of air soil are included, as are small maps showing the location of wells and sampling points.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1984
- Accession Number
- ADA286217
Entities
People
- W. Trautmann