Implementation Document for Recharge Trench Project for the North Boundary System Improvements IRS.
Abstract
Planned improvements to the north boundary recharge system consist of a line of five recharge trenches extending along the eastern half of the system about 45 feet north of the bentonite barrier. These gravel filled trenches will be constructed to extend to the denver formation surface. Volumes 1 and 2 of this implementation document contain: (1) MOU between the Army and Shell concerning Shell's participation in the IRA'S; (2) Construction work plans; (3) Cost estimates; (4) Task specific health and safety plan; and (5) Engineering specification