Implementation Document for Northwest Boundary System Short-Term Improvements

Abstract

The Northwest Boundary System Short-Term Improvements interim response action will consist of the extension of the barrier north of the system and the addition of dewatering wells in this area. New dewatering and recharge wells will also be added to the southwest part of the system. This implementation document addresses only the improvements to the north. This report is three volumes in one. Volume I contains: MOU between the Army and Shell concerning shell's participation in the IRA's, Construction work plans, Cost estimates, and Task specific health and safety plan. Volume II contains engineering specifications. Engineering drawings are found in Volume III.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1990
Accession Number
ADA286361

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Chemical Synthesis
  • Chemistry
  • Construction
  • Groundwater
  • Material Degradation Processes
  • Materials
  • Materials Laboratories
  • Materials Processing
  • Materials Science
  • Materials Testing
  • Measurement
  • Medical Personnel
  • Occupational Safety And Health
  • Organic Compounds
  • Organic Materials
  • Pain
  • Personal Protective Equipment

Readers

  • Business Analytics
  • Defense Acquisition Program Management
  • Geotechnical Engineering.