Proposed Decision Document for the Interim Response Action for the Improvement of the North Boundary System at Rocky Mountain Arsenal Via Construction of Groundwater Recharge Trenches

Abstract

The objective of this interim response action is to correct an hydraulic imbalance in the north boundary treatment and recharge system. Ten gravel filled recharge trenches will be constructed along the down-gradient side of the slurry wall. This proposed decision document provides summaries of: Alternative technologies considered; Significant events leading to the awarding of the IRA contract; The IRA project; and The applicable or relevant and appropriate requirements, standards, criteria, or limitations (ARAR'S) associated with the program.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 01, 1988
Accession Number
ADA286372

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Air Pollution
  • Birds
  • Boundaries
  • Chemical Warfare
  • Chemical Warfare Agents
  • Construction
  • Contamination
  • Ecology
  • Environmental Monitoring
  • Environmental Pollutants
  • Environmental Protection
  • Excavation
  • Groundwater
  • Rocky Mountains
  • United States
  • Waste Disposal Facilities
  • Wildlife

Readers

  • Environmental Engineering.
  • Geotechnical Engineering.
  • Groundwater Contamination Remediation.