Final Decision Document for the Interim Response Action for the Groundwater Intercept and Treatment System, North of Basin F, Rocky Mountain Arsenal.
Abstract
The specific objectives of the interim response action for the ground water intercept and treatment system North of Basin F are to initiate capture of the contaminated alluvial aquifer water from below Basin F, collect operational data on the interception, treatment, and recharge of contaminated ground water in this area that will aid in the design of a final response action. This proposed decision document provides summaries of alternatives considered, significant events leading to the initiation of the IRA, the IRA Project, the applicable or relevant and appropriate requirements (ARAR's). The preferred system will consist of withdrawal wells, carbon adsorption filters, and recharge wells.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1988
- Accession Number
- ADA288940