Litigation Technical Support and Services, Rocky Mountain Arsenal Offpost Remedial Investigation/Feasibility Study.

Abstract

The objective of this task is to conduct a remedial investigation and feasibility study off-post of RMA. This RI/FS will: (1) evaluate the extent of contamination to the north and northwest of the arsenal, (2) estimate the risk to the environment and public health, (3) identify appropriate remedial responses. Sections of the report discuss the following: (1) geotechnical and chemical analysis, (2) ground water sampling, (3) safety plan for field activities, (4) data management and evaluation of data, (5) ea methodology which will be required in order to determine the magnitude and probability of actual or potential harm to the public or the environment.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jul 01, 1988
Accession Number
ADA289097

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Alkenes
  • Birds
  • Chemical Synthesis
  • Chemistry
  • Contamination
  • Drainage Basins
  • Environmental Pollutants
  • Environmental Protection
  • Geography
  • Groundwater
  • Habitats
  • Health Services
  • Medical Personnel
  • Metal Matrix Composites
  • Waste Disposal Facilities
  • Waste Products
  • Water Resources

Readers

  • Environmental Remediation and Restoration.