Environmental Cleanup: Case Studies of Six High Priority DOD Installations.

Abstract

This is a supplement to our report entitled Environmental Cleanup: Too Many High Priority Sites Impede DOD's Program (GAo/NsIAD-94-133, Apr. 21, 1994). It provides six installation case studies addressing issues outlined in your request and discussed in our report. These issues include the status of the restoration program, the cost of cleanup to date and projected costs, the cleanup options considered, the option selected, expected completion, and the applicable cleanup standards. The case studies also provide installation specific information on reasons an installation was listed on the National Priorities list (NPL), the regulatory process, cooperation between the installation and the regulatory agencies, staffing at the installations and the regulatory agencies, and the process for funding the cleanup. (See apps. I through VI.)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 18, 1994
Accession Number
ADA289465

Entities

Organizations

  • United States Government Accountability Office

Tags

Communities of Interest

  • Biomedical
  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Air Force Facilities
  • Bioremediation
  • Chemical Warfare
  • Chemical Warfare Agents
  • Drinking Water
  • Environmental Protection
  • Environmental Restoration And Remediation
  • Fixed Wing Aircraft
  • Groundwater
  • Hazardous Waste
  • Hazardous Waste Sites
  • Hygiene
  • Medical Personnel
  • Second World War
  • Waste Disposal Facilities
  • Waste Products
  • Water Purification

Fields of Study

  • Environmental science

Readers

  • Defense Acquisition Program Management
  • Environmental Engineering.