Improving Central Heating Plant Performance at the Defense Construction Supply Center (DCSC): Advanced Operation and Maintenance Methods.

Abstract

A 1987 air pollution emissions test done by the U.S. Army Environmental Hygiene Agency (USAEHA) identified several problems with the central heating plant (CHP) at the Defense Construction Supply Center (DCSC), Columbus, OH. Though DCSC repaired the specified problems, improved coal specifications, and tried to reduce air infiltration, CHP performance remained at unacceptable levels. Consequently, DCSC contracted the U.S. Army Construction Engineering Research Laboratories (USACERL) to apply advanced operation and maintenance procedures to improve its combustion system. This study employed a system-wide approach to evaluate the CHP 5 fuel storage, combustion, heat distribution, and the control of air emissions. Many short-term improvements to the CHP were identified and tested. Subsequent combustion and air emissions tests revealed that the recommended improvements successfully increased CHP efficiency. Long-term improvements were also recommended to help maintain the short-term improvements. (MM)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1994
Accession Number
ADA289762

Entities

People

  • Charles M. Schmidt
  • James Standerfer
  • John Gostich
  • Joseph Mignacca
  • Martin J. Savoie

Organizations

  • Construction Engineering Research Laboratory

Tags

Communities of Interest

  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Air Flow
  • Air Pollution
  • Air Pollution Control Equipment
  • Combustion
  • Combustion Chambers
  • Construction
  • Control Panels
  • Efficiency
  • Emission
  • Engineering
  • Environmental Protection
  • Flue Gases
  • Heating Plants
  • Maintenance
  • Plasmids
  • Separators
  • Standards

Readers

  • Energy Conservation and Renewable Energy Engineering.
  • Environmental Engineering.
  • Logistics and Supply Chain Management.