Determination of Decontamination Criteria, DIMP and DCPD.
Abstract
This is a progress report on Aerojet's studies of experiments currently underway (e.g., plant growth and DIMP and DCPD lysimeter tests). The full scale lysimeter tests are continuing. The first group of lysimeters has been undergoing contaminant irrigation for 199 days, the second group for 56 days. The full scale soil culture tests are continuing. (MM)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 07, 1976
- Accession Number
- ADA289881
Entities
People
- P. A. O'donovan
Organizations
- Aerojet Rocketdyne Holdings