Rocky Mountain Arsenal, Pumping Tests.
Abstract
WES was authorized by RMA to install five test wells and related observation wells or piezometers and conduct pumping test on each of the test wells. The five wells were installed and developed during the period of 16-23 March 1978. One pumping test was conducted during the period 5-10 April 1978; The remaining four during 12 June - 10 July 1978. This report describes the well installation, conduct of the pumping tests and results of the analyses of each test. -BKA