Rocky Mountain Arsenal, Offpost Contamination Assessment, Technical Plan A003 (Revision A).

Abstract

The objectives of the off-post contamination assessment are to determine: (1) Existence and/or extent of contamination migration; and (2) effects of such contamination on the human environment. This technical plan describes the procedures, equipment, and rationale for the following work elements: (1) Geotechnical data collection and evaluation; (2) surface and ground water sampling; (3) chemical analysis; (4) data analysis; (5) contamination assessment; and (6) document preparation. Ground water monitoring is the major task under this plan of study, and the key element of the technical plan will be to detail procedures for establishing and operating the ground water network. -BKA

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 16, 1985
Accession Number
ADA289923

Tags

Communities of Interest

  • Biomedical
  • Weapons Technologies

DTIC Thesaurus Topics

  • Birds
  • Chemical Analysis
  • Chemical Synthesis
  • Chemistry
  • Ecology
  • Environmental Pollutants
  • Environmental Protection
  • Groundwater
  • Habitats
  • Liquid Chromatography
  • Materials Laboratories
  • Materials Science
  • Materials Testing
  • Medical Personnel
  • Organic Chemistry

Fields of Study

  • Environmental science

Readers

  • Environmental Remediation and Restoration.
  • Instructional Design and Training Evaluation.