Proposed Decision Document for the Sanitary Sewer System, Interim Response Action at Rocky Mountain Arsenal.
Abstract
The primary objective of this interim response action is to prevent the potential spread of contamination via the sanitary sewer system. The sources of this potential contamination are (1) contaminated group water that infiltrates the system and (2) contaminated surface water runoff that enters the system through exposed connections. This proposed decision document provides summaries of the following: (1) Alternatives considered (2) Significant events leading to the initiation of the IRA (3) The IRA project (4) The applicable or relevant and appropriate requirements, standards, criteria, or limitations (ARAR's) associated with the program. (MM)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1989
- Accession Number
- ADA289949