North Boundary System Component, Response Action Assessment, Task 36, Draft Final Technical Plan.
Abstract
The purposes of Task 36 are to: (1) Collect, assemble, and evaluate existing and new geotechnical, hydrologic, and water quality data; (2) Examine the components of the North Boundary Containment System; (3) Evaluate response actions which should increase system efficiency. This task will further characterize the geologic regime in the vicinity of the NBCS. Also a hydrologic evaluation will be performed using primarily water level and quality data. The scope of work includes development, installation, and sampling of new monitoring wells plus an evaluation of the physical condition, integrity, and hydrologic properties of the barrier. Sections of this plan detail procedures to be used in the following programs: (1) Geotechnical investion; (2) Chemical analysis; and (3) Quality assurance. (MM)
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 1987
- Accession Number
- ADA290003