Calgon Plan Troubleshooting and Contingency Plan at Rocky Mountain Arsenal.

Abstract

This plan has a two-fold purposes: To assure the proper course of action is clearly known in case of a contingency arising at the North Boundary Treatment System and to give the plant operator on duty a guide to detect and correct quickly and accurately any plant and/or plant appurtency malfunction. The format in both cases starts form and observation, gives a most likely cause for occurrence, indicates action to be taken and the best order, and tells where the instrument, switch, personnel can be located. (AN)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1978
Accession Number
ADA290032

Entities

People

  • Dennis M. Prusinski

Tags

Communities of Interest

  • Energy and Power Technologies
  • Human Systems

DTIC Thesaurus Topics

  • Boundaries
  • Control Panels
  • Detectors
  • Dewatering
  • Feed Pumps
  • Feed Water
  • Fire Prevention
  • Floods
  • Malfunctions
  • Mountains
  • Observation
  • Pumps
  • Rocky Mountains
  • Security
  • Security Personnel
  • Switches
  • Troubleshooting

Readers

  • Aerospace Test and Evaluation
  • Agricultural Chemistry/Soil Science
  • Regression Analysis.