Calgon Plan Troubleshooting and Contingency Plan at Rocky Mountain Arsenal.
Abstract
This plan has a two-fold purposes: To assure the proper course of action is clearly known in case of a contingency arising at the North Boundary Treatment System and to give the plant operator on duty a guide to detect and correct quickly and accurately any plant and/or plant appurtency malfunction. The format in both cases starts form and observation, gives a most likely cause for occurrence, indicates action to be taken and the best order, and tells where the instrument, switch, personnel can be located. (AN)
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1978
- Accession Number
- ADA290032
Entities
People
- Dennis M. Prusinski