Water Treatment at Rocky Mountain Arsenal, Preoperational and Pilot Test Plan.
Abstract
This 10,000 GPH Water Treatment Plant Test Plan is designed to demonstrate the proper functioning of all equipment. This includes all mechanical and electrical systems checkouts, establishing and maintaining a carbon bed, and identifying any modifications desired to optimize the process. This is an interim facility designed to demonstrate the feasibility of removing DIMP and DCPD from water at a 10,000 GPH test unit. Included with this plan is the operators' checklist for water treatment facility, installation restoration program. BKA
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1976
- Accession Number
- ADA290176
Entities
People
- Richard Welling