Water Treatment at Rocky Mountain Arsenal, Preoperational and Pilot Test Plan.

Abstract

This 10,000 GPH Water Treatment Plant Test Plan is designed to demonstrate the proper functioning of all equipment. This includes all mechanical and electrical systems checkouts, establishing and maintaining a carbon bed, and identifying any modifications desired to optimize the process. This is an interim facility designed to demonstrate the feasibility of removing DIMP and DCPD from water at a 10,000 GPH test unit. Included with this plan is the operators' checklist for water treatment facility, installation restoration program. BKA

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1976
Accession Number
ADA290176

Entities

People

  • Richard Welling

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Engineers
  • Evaporation
  • Feed Pumps
  • Feed Water
  • Flow
  • Flow Rate
  • Installation Restoration
  • Measurement
  • Mountains
  • Pumps
  • Rocky Mountains
  • Specifications
  • Steady State
  • Test Beds
  • Water Flow
  • Water Pumps
  • Water Purification

Readers

  • Aerospace Test and Evaluation
  • Environmental Engineering
  • Wetland-Land-Environmental Management.