Determination of Decontamination Criteria, DIMP and DCPD,
Abstract
THIS IS A PROGRESS REPORT ON AEROJET'S STUDIES OF EXPERIMENTS CURRENTLY UNDERWAY (E.G., PLANT GROWTH AND DIMP AND DCPD LYSIMETER TESTS.) THE FULL SCALE LYSIMETER TESTS ARE CONTINUING. A NEW SET OF FIVE LYSIMETERS WAS INOCULATED WITH DIMP ON APRIL 21, 1976. THE FIRST SET OF LYSIMETER TESTS IS CONTINUING. THE ANALYSIS OF THE HARVESTED PLANT TISSUES FROM THE RANGE FINDING GROWTH TESTS HAVE CONTINUED. CONSTRUCTION OF THE NEW THREE ROOM, 14 X 42 FOOT GREENHOUSE TO BE USED IN THE SOIL CULTURE EXPERIMENTS HAS BEEN COMPLETED AND HAS BEEN OUTFITTED WITH HEATERS AND COOLERS. Pg. Form298. JMD
Document Details
- Document Type
- Technical Report
- Publication Date
- May 07, 1976
- Accession Number
- ADA290258
Entities
People
- P. A. O'donovan
Organizations
- Aerojet Rocketdyne Holdings