Technical status report for Contract N00014-94-C-2063 (System Quality Consultants, Inc.).
Abstract
During this month's reporting period, SQC continued to provide project management to the Backgrounds Data Center (BDC). In addition to the Project Manager, SQC provided management of the Operations, Software Development, Project Support, and Specification and Test efforts. The most significant events that occurred are the continuation of MSX Data System Tests and the continued upgrade to the pipeline software and the operations procedures.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 31, 1995
- Accession Number
- ADA291210