Contamination Survey, Phase I, Section 26 and 35, Task 6.

Abstract

This draft final technical plan describes the work that will be undertaken during the Phase I contamination survey of Sections 26 and 35. The objective of Task 6 is to obtain the geotechnical and geochemical data from each site sufficient to allow determination of (1) source geometry, (2) contaminants present, and (3) design of the Phase II program. Sections of this plan detail information on the following: (1) site background; (2) field sampling; (3) geophysical investigation; (4) chemical analysis; (5) quality control; (6) health and safety; and (7) data compilation and management. -BKA

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1985
Accession Number
ADA291441

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Chemical Analysis
  • Chemical Compounds
  • Chemical Synthesis
  • Chemistry
  • Chlorides
  • Construction
  • Coordinate Systems
  • Detectors
  • Ecology
  • Environmental Pollutants
  • Groundwater
  • Health Services
  • Medical Personnel
  • Photographs
  • Sulfur Compounds
  • Unexploded Ammunition
  • Waste Products

Readers

  • Business Analytics
  • Environmental Remediation and Restoration.