Pilot Containment Recharge System. Test Plan.
Abstract
The objectives of the proposed test are to provide preliminary data for the design-construction of recharge pits along the North Boundary containment line (bentonite Barrier). This evaluation will guide in determining the size, spacing, flow rate, and number of recharge pits needed so as to approximate as closely as possible exiting ground water flow conditions prior to installation and operation of the pilot containment system. -BKA