Closure Plan: Basin F, Rocky Mountain Arsenal.

Abstract

Rocky Mountain Arsenal submitted a revised Part B Permit application to the Colorado Department of Health on November 28, 1985. The CDH informed the RMA of the agency's disapproval of the closure plan for Basin F. The revised Basin F closure plan incorporates all requirements stated in the Colorado Hazardous Wastes Management Act Regulations (part 265 subpart G and section 100) and incorporates consideration of the comments contained in the October 17, 1985 notice of disapproval. This closure plan is divided into six sections: Introduction, Basin F Overview, Waste Characteristics, Closure Plan Procedures Schedule, Certification of Closure. At the conclusions of these closure activities, the Basin F will no longer be a potential source of contamination and will be suitable for modified unrestricted use (i.e. the site will be suitable for general use excluding use of any contaminated ground water that may be beneath the site. -BKA

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1985
Accession Number
ADA291585

Entities

Organizations

  • Ebasco Services

Tags

Communities of Interest

  • Biomedical
  • Human Systems

DTIC Thesaurus Topics

  • Chemical Warfare
  • Construction
  • Contamination
  • Environmental Pollutants
  • Groundwater
  • Hazardous Waste
  • Health
  • Health Services
  • Medical Personnel
  • Protective Clothing
  • Rocky Mountains
  • Solid Waste
  • Sulfur Compounds
  • Test Methods
  • Toxicity
  • Waste Disposal Facilities
  • Waste Products

Readers

  • Defense Financial Management and Audit.
  • Environmental Engineering.
  • Environmental Remediation and Restoration.