Contamination Assessment Report, Site 36-8, Chemical Drainage Ditch. Phase 1. Version 3.2.

Abstract

This final report documents the phase I contamination survey of the site 36-8 two open chemical drainage ditches. 10 samples from 4 borings were analyzed for volatile and semivolatile organics and metals with separate analyses for AS, HG, and DBCP. AS, HG, DLDRN, and DIMP were detected at or above their respective indicator ranges. A phase II program consisting of 25 additional boring is recommended. The volume of potentially contaminated material is estimated at 12,000 cubic yards. Appendices: chemical names, phase I chemical data, comments and responses. -BKA

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 01, 1987
Accession Number
ADA291898

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Aerial Photographs
  • Alkenes
  • Chemical Analysis
  • Chemical Warfare Agents
  • Chemical Weapons
  • Chlorides
  • Contamination
  • Cyanides
  • Detection
  • Detectors
  • Ecology
  • Environmental Protection
  • Groundwater
  • Materials
  • Organic Compounds
  • Rocky Mountains
  • Unexploded Ammunition

Fields of Study

  • Environmental science

Readers

  • Environmental Remediation and Restoration.