Contamination Assessment Report, Site 1-7, Hydrazine Blending and Storage Facility. Phase 1. Version 2.1.
Abstract
This draft final report documents the phase I contamination survey of site 1-7, the hydrazine blending and storage facility constructed in 1961 for the Air Force. 54 Samples from 15 borings were analyzed for volatile and semivolatile organics and metals with separate analyses for AS, HG, DBCP, Hydrazines, and Nitrosamines. MIBK, Dieldrin, PB, AS, and ZN were detected above their respective indicator ranges. A phase II program consisting of 21 additional borings is recommended. The volume of potentially contaminated soil present is estimated at 65,000 cubic yards. -BKA
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 01, 1987
- Accession Number
- ADA292208
Entities
Organizations
- Ebasco Services