60% Design Cost Estimate Interim Action, Rocky Mountain Arsenal, Basin F.
Abstract
This document includes cost estimates for the following: (1) Rip-rap removal; (2) grading; (3) clay for capping and lining; (4) waste pile select fill; (5) topsoil; (6) sumps and piping; (7) debris removal; (8) hauling waste; (9) solidication; (10) roads; (11) filters; (12) drainage net. (MM)
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1987
- Accession Number
- ADA292956