Terminal Doppler Weather Radar (TDWR) Build 5B Operational Test and Evaluation (OT& E) Integration and OT& E Operational Test Plan.
Abstract
The Terminal Doppler Weather Radar (TDWR) Build 5B Enhancement Operational Test and Evaluation (OT&E) Integration and OT&E Operational Test Plan provides the overall philosophy and approach to Build 5B OT&E testing, and identifies OT&E objectives, responsibilities, and resources. The TDWR Build 5B Enhancement provides connectivity to the Low Level Wind Shear Alert System (LLWAS) III to display LLWAS III data along with TDWR hazardous weather data on TDWR Geographic Situation Displays (GSD) and Ribbon Display Terminals (RDT). The TDWR Build 5B OT&E is scheduled to occur at the TDWR sites in Denver, CO, November and December 1994, and in Orlando, FL, spring 1995.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 1995
- Accession Number
- ADA293251
Entities
People
- Donne Wedge
- Peter Guthlein
- Radame Martinez
- Steven Viveiros
Organizations
- Federal Aviation Administration