Program for Reclamation of Surface Aquifer, Rocky Mountain Arsenal, Denver Colorado. Supplement.
Abstract
This report is a final follow-up to a preliminary study done by the Corps of Engineers: Preliminary study ground water contamination, RMA, 11 MAY 1960. The basic requirements for this study as outlined by the chemical corps. included the following: Plan for correction of contamination, description of nature and extent of contamination, description and nature of phytotoxicants, determination of animal toxicity and supplementary method of waste disposal. During the preparation of this report, chemical corps implied that the total responsibility for the combined efforts of all agencies involved in this work has been assigned to the Corps of Engineers, though no specific instructions to this effect have ever been received. Though there are problems to be solved, all efforts of all agencies are aimed at the final solution of paramount problem, decontamination of the aquifer. (AN)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1961
- Accession Number
- ADA293490
Entities
Organizations
- Omaha District, U.S. Army Corps of Engineers