Draft Final Decision Document For The Interim Action Of Basin F, Hazardous Waste Cleanup, Rocky Mountain Arsenal.
Abstract
The objectives of the interim response action for Basin F are to prevent and eliminate the emissions of volatile chemicals from Basin F, to prevent potential infiltration of Basin F contaminated liquids to ground water and to eliminate potential adverse impacts to wildlife. This proposed decision document provides summaries of alternative technologies considered, significant events leading to the awarding of the IRA contract, the IRA project and the applicable or relevant and appropriate requirements (ARARS), standards, criteria, or limitations associated with the program. (AN)
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 01, 1988
- Accession Number
- ADA294370