Project Completion Report For Department Of The Army, Contracting Division, Rocky Mountain Arsenal, Commerce City, Colorado.
Abstract
This report details the procedures and equipment used in the closure of the deep injection well near basin F. Sections discuss the following: (1) Construction of the surface facilities associated with the well; materials and methods used in plugging the well. (2) Schedule, labor distribution, and contractor percentage of the work. (3) Decontamination procedures used for personnel and equipment. Appendices include: (1) Daily report sheets from Chen and associates. (2) Chemical sampling results for water, soil and air. (3) Certificates of post-employment medical examinations of personnel.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 11, 1985
- Accession Number
- ADA294753