Conceptual Design Analysis, Northwest Boundary Containment/Treatment System, Rocky Mountain Arsenal, Commerce City, Colorado, FY82. Volume 2.

Abstract

The purpose of this concept design analysis is to define the following for the Northwest Boundary Containment/Treatment System: (1) Functional and technical requirements; (2) Building and equipment requirements; (3) Support systems. Specifications are included for the following elements: (1) Carbon Treatment system; (2) Site development - grading and placement; (3) Building details - walls, floors, etc. ; (4) Structural details - steel and foundations; (5) Mechanical - plumbing and pipes; (6) Electrical. Volume II contains cost estimates and design calculations.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jul 16, 1982
Accession Number
ADA294886

Tags

Communities of Interest

  • Biomedical
  • C4I
  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Boundaries
  • Carbon Steels
  • Construction
  • Control Systems
  • Corporations
  • Cost Estimates
  • Design Criteria
  • Drinking Water
  • Engineering
  • Flow Rate
  • Groundwater
  • Materials
  • Rocky Mountains
  • Standards
  • Storage Tanks
  • Valves
  • Water Pipes

Readers

  • Environmental Remediation and Restoration.
  • Systems Analysis and Design