Conceptual Design Analysis, Northwest Boundary Containment/Treatment System, Rocky Mountain Arsenal, Commerce City, Colorado, FY82. Volume 1.

Abstract

The purpose of this concept design analysis is to define the following for the Northwest Boundary Containment/Treatment System: (1) Functional and technical requirements; (2) Building and equipment requirements; (3) Support systems. Specifications are included for the following elements: (1) Carbon treatment system; (2) Site Development - grading and placement; (3) Building details - walls, floors, etc.; (4) Structural details - steel and foundations; (5) Mechanical - plumbing and pipes; (6) Electrical. Volume II contains cost estimates and design calculations.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jul 16, 1982
Accession Number
ADA294887

Tags

Communities of Interest

  • Biomedical
  • Energy and Power Technologies
  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Air Compressors
  • Boundaries
  • Carbon Steels
  • Commerce
  • Compressed Air
  • Compressors
  • Construction
  • Cost Estimates
  • Design Criteria
  • Drinking Water
  • Engineers
  • Feed Pumps
  • Groundwater
  • Lightning Protection
  • Materials
  • Mountains
  • Rocky Mountains

Readers

  • Aerospace Test and Evaluation
  • Atmospheric Science/Meteorology
  • Systems Analysis and Design