Conceptual Design Analysis, Northwest Boundary Containment/Treatment System, Rocky Mountain Arsenal, Commerce City, Colorado, FY82. Volume 1.
Abstract
The purpose of this concept design analysis is to define the following for the Northwest Boundary Containment/Treatment System: (1) Functional and technical requirements; (2) Building and equipment requirements; (3) Support systems. Specifications are included for the following elements: (1) Carbon treatment system; (2) Site Development - grading and placement; (3) Building details - walls, floors, etc.; (4) Structural details - steel and foundations; (5) Mechanical - plumbing and pipes; (6) Electrical. Volume II contains cost estimates and design calculations.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 16, 1982
- Accession Number
- ADA294887