Basin F Groundwater Treatment, Interim Response Action, Phase 1, Site Investigation and Analysis, Field Investigation Work Plan.
Abstract
The purpose of the Field Investigation and Analysis is to Perform a Ground Water Investigation including; (1) Installation of six monitoring wells; (2) Well development; (3) Aquifer permeability testing; (4) Ground water sampling and analysis. Sections of this plan detail information on: (1) General requirements - utility clearances, site restoration, surveying; (2) Drilling procedures; (3) Sampling procedures; (4) Well completion; (6) Personnel responsibilities.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1988
- Accession Number
- ADA295125