Final Decision Document for the Interim Response Action at the Lime Settling Basins, Rocky Mountain Arsenal, Version 4.0.
Abstract
The objective of the interim response action at the lime settling basins is to mitigate the threat of releases from the basins. The proposed IRA consists of: (1) Relocation of sludge material to the settling basin, (2) Construction of a 360 degree subsurface barrier around the basins, (3) Construction of a soil and vegetative cover over the material, (4) Installation of a ground water extraction system. This decision document provides summaries of: (1) alternative technologies considered, (2) Significant events leading to the initiation of the IRA, (3) The IRA Project, (4) Applicable or relevant and appropriate requirements, standards, criteria, and limitations (ARAR's) associated with the program.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 1990
- Accession Number
- ADA295127