Implementation Document for Northwest Boundary System, Long-Term Improvements, Interim Response Action. Volume 1. General.

Abstract

Vol 1- General: This IRA is being conducted as part of the IRA process for the RMA. The Long-Term Improvements IRA consist of completion of the short-term improvements IRA and implementation of monitoring program for the entire Northwest Boundary System, with no modification to the existing treatment plant. The implementation of the NWB system long-term improvements IRA is intended to provide monitoring data, construction of additional monitoring wells (including revegetation of areas disturbed during construction) monitoring both treatment plant and aquifer water quality, water-table monitoring, and preparation of a report containing an evaluation of system performance based on quarterly monitoring L-R one year. Vol 2- Engineering specifications: This specification covers the construction of seven nominal 2- inch diameter alluvial monitoring wells for monitoring water-table elevation and groundwater.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1992
Accession Number
ADA295204

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Boundaries
  • Construction
  • Contractors
  • Contracts
  • Diameters
  • Engineering
  • Groundwater
  • Medical Personnel
  • Organic Compounds
  • Pain
  • Personal Protective Equipment
  • Protective Equipment
  • Rocky Mountains
  • Specifications
  • Standards
  • Test And Evaluation
  • Water Quality

Fields of Study

  • Environmental science

Readers

  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.
  • Environmental Remediation and Restoration.