Implementation Document for Northwest Boundary System, Long-Term Improvements, Interim Response Action. Volume 1. General.
Abstract
Vol 1- General: This IRA is being conducted as part of the IRA process for the RMA. The Long-Term Improvements IRA consist of completion of the short-term improvements IRA and implementation of monitoring program for the entire Northwest Boundary System, with no modification to the existing treatment plant. The implementation of the NWB system long-term improvements IRA is intended to provide monitoring data, construction of additional monitoring wells (including revegetation of areas disturbed during construction) monitoring both treatment plant and aquifer water quality, water-table monitoring, and preparation of a report containing an evaluation of system performance based on quarterly monitoring L-R one year. Vol 2- Engineering specifications: This specification covers the construction of seven nominal 2- inch diameter alluvial monitoring wells for monitoring water-table elevation and groundwater.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1992
- Accession Number
- ADA295204