Crucial Links for Construction Site Productivity: Real-Time Construction Layout and As-Built Plans.
Abstract
This report documents the results of a 2-year research and development effort by the Consortium for Advanced Positioning System (CAPS). As a result of this program, integration of real-time site positioning with three-dimensional computer-aided design has been accomplished and commercialized. This technology achievement will greatly facilitate construction site layout and enable the capture of "as-builts" as a routine part of the construction process. Integration was achieved with three different site positioning systems: SPSi's proprietary technology RtPM; total stations and global positioning.
Document Details
- Document Type
- Technical Report
- Publication Date
- May 01, 1995
- Accession Number
- ADA295233
Entities
People
- Carl Magnell
- Glen Weathers
- J. M. Williams
- Jerry King
- Yvan J. Beliveau