Offpost Interim Response Action and Remedial Investigation/Feasibility Study, Draft Data Management Plan.
Abstract
The objective of this plan is to describe the steps to be used to control the flow of data from sample collection through analysis, reduction, validation, and reporting in the format by usathama.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 1989
- Accession Number
- ADA295255