Offpost Interim Response Action and Remedial Investigation/Feasibility Study. Draft Final Field Operations Procedures Plan

Abstract

This field operations procedures plan (FOP) details procedures that will be followed in implementing field activities conducts for the off-post IRA. Procedures discussed include: Borehole drilling, Well installation and development, Hydraulic testing, Geophysical methods, Measurement/sampling of ground water, surface water, soil, sediment, and biota, Sample custody, Decontamination, Field documentation.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1989
Accession Number
ADA295336

Tags

Communities of Interest

  • Biomedical
  • Human Systems

DTIC Thesaurus Topics

  • Acid-Base Indicators
  • Chemical Analysis
  • Construction
  • Contamination
  • Contractors
  • Ecology
  • Electromagnetic Fields
  • Environmental Pollutants
  • Environmental Protection
  • Field Equipment
  • Groundwater
  • Hazardous Materials
  • Measurement
  • Rocky Mountains
  • Solid Waste
  • Surface Waters
  • Volatile Organic Compounds

Readers

  • Computer Science.
  • Environmental Remediation and Restoration.