Interim Response Action, Basin F Liquid Incineration Project, Submerged Quench Incinerator, Startup Plan.

Abstract

The objective of the startup plan is to describe the procedures that will be used to prepare the SQI system equipment to a point of operational readiness. This document discusses planned activities from mechanical completion of the SQI facility through testing of the system prior to the trail burn. The major components of the startup process include: Equipment checkout, surrogate testing, and shakedown testing. This plan does not discuss operating procedures relating to starting the SQI facility.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jul 01, 1992
Accession Number
ADA295531

Entities

Organizations

  • Weston Solutions (United States)

Tags

Communities of Interest

  • Biomedical
  • Energy and Power Technologies
  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Air Force
  • Air Pollution Control Systems
  • Chemical Synthesis
  • Chemistry
  • Detectors
  • Dielectric Gases
  • Employment
  • Engineers
  • Environment
  • Flue Gases
  • Health Services
  • Hygiene
  • Liquids
  • Materials Testing
  • Medical Personnel
  • Performance Tests
  • Test Methods

Fields of Study

  • Physics

Readers

  • Aerospace Test and Evaluation
  • Environmental Engineering.