Interim Response Action, Basin F Liquid Incineration Project, Submerged Quench Incinerator, Startup Plan.
Abstract
The objective of the startup plan is to describe the procedures that will be used to prepare the SQI system equipment to a point of operational readiness. This document discusses planned activities from mechanical completion of the SQI facility through testing of the system prior to the trail burn. The major components of the startup process include: Equipment checkout, surrogate testing, and shakedown testing. This plan does not discuss operating procedures relating to starting the SQI facility.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 1992
- Accession Number
- ADA295531
Entities
Organizations
- Weston Solutions (United States)