Cutoff Walls and Cap for Lime and M-1 Settling Basins, Rocky Mountain Arsenal, Colorado. Part 1: Final Design Analysis.

Abstract

This document consists of 2 parts: Final design analysis, and specifications. The purpose of the project was to develop a design for the Interim Response Actions (IRA) at the Lime and M-l Settling Basins at Rocky Mountain Arsenal (RMA), Commerce City, Colorado. The purpose of the IRA at the Lime and M-l Settling Basins is to mitigate the threat of release from the Basins on an interim basis, pending determination of the final remedy in the Onpost Record of Decision (ROD). The IRA for the M-l Basins also includes treatment of the waste materials in the basins with in-situ vitrification (ISV), which is being designed by contract with Woodward-Clyde Consultants. (MM)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Oct 01, 1990
Accession Number
ADA295551

Tags

Communities of Interest

  • Biomedical
  • Cyber
  • Human Systems

DTIC Thesaurus Topics

  • Chemical Synthesis
  • Chemical Warfare
  • Chemical Warfare Agents
  • Chemistry
  • Construction
  • Environmental Protection
  • Groundwater
  • Health Services
  • Hygiene
  • Materials Laboratories
  • Materials Science
  • Materials Testing
  • Medical Personnel
  • Organic Compounds
  • Protective Equipment
  • Transducers
  • Water Supplies

Readers

  • Environmental Engineering.