Cutoff Walls and Cap for Lime and M-1 Settling Basins, Rocky Mountain Arsenal, Colorado. Part 2: Specifications (for Final Review).
Abstract
This document consists of 2 parts: Final design analysis, and specifications. The specifications included in this volume are edited for 90% final design using the Omaha District's SpecNet computerized specifications system. Changes to the master guide specifications have been specially marked to indicate portions intended for deletion and those intended to be inserted to the master guide specifications. This gives the reviewer the ability to clearly see the proposed changes to the master guide specification. (MM)
Document Details
- Document Type
- Technical Report
- Publication Date
- Oct 01, 1990
- Accession Number
- ADA295552