Work Plan and Sampling and Analysis Plan for Interim Remedial Actions, Indian Mountain LRRS, Alaska.

Abstract

This Final Work plan addendum report is provided under Contract No. F41624-94-D-8046, between the U.S. Air Force and Jacobs Engineering Group Inc. The purpose of this report is to describe and detail the activities to be conducted as part of the Interim Remedial Action at Indian Mountain Long Range Radar Station, Alaska. This report contains eight Sections. Section 1.0 provides introduction and background information, and states the objectives for the work. Section 2.0 describes the interim remedial action, including construction specifications. Section 3.0 details the description and construction of the containment cell. Additional characterization of Source Areas SSO2, SSlO, OTO8, SSll and SS09 is described in Section 4.0. Section 5.0 provides information regarding decontamination and waste management procedures. Sections 6.0, 7.0 and 8.0 provide information on project organization and schedule, reporting, and references, respectively. (AN)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jul 01, 1995
Accession Number
ADA296658

Entities

Organizations

  • Jacobs Engineering Group

Tags

Communities of Interest

  • Biomedical
  • Human Systems

DTIC Thesaurus Topics

  • Air Force
  • Alkenes
  • Civil Engineering
  • Construction
  • Drinking Water
  • Engineering
  • Environmental Protection
  • Materials Laboratories
  • Materials Testing
  • Medical Personnel
  • Organic Compounds
  • Radar Stations
  • Soil Tests
  • Test Methods
  • Volatile Organic Compounds
  • Waste Disposal Facilities
  • Waste Management

Readers

  • Environmental Remediation and Restoration.
  • Technical Research and Report Writing.