Work Plan and Sampling and Analysis Plan for Interim Remedial Actions, Indian Mountain LRRS, Alaska.
Abstract
This Final Work plan addendum report is provided under Contract No. F41624-94-D-8046, between the U.S. Air Force and Jacobs Engineering Group Inc. The purpose of this report is to describe and detail the activities to be conducted as part of the Interim Remedial Action at Indian Mountain Long Range Radar Station, Alaska. This report contains eight Sections. Section 1.0 provides introduction and background information, and states the objectives for the work. Section 2.0 describes the interim remedial action, including construction specifications. Section 3.0 details the description and construction of the containment cell. Additional characterization of Source Areas SSO2, SSlO, OTO8, SSll and SS09 is described in Section 4.0. Section 5.0 provides information regarding decontamination and waste management procedures. Sections 6.0, 7.0 and 8.0 provide information on project organization and schedule, reporting, and references, respectively. (AN)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 1995
- Accession Number
- ADA296658
Entities
Organizations
- Jacobs Engineering Group