Conceptual Design Analysis, Northwest Boundary Containment/Treatment System, Rocky Mountain Arsenal, Commerce City, CO, FY82.
Abstract
The purpose of this concept design analysis is to define the following for the Northwest Boundary containment/treatment system: (1) Functional and technical requirements. (2) Building and equipment requirements. (3) Support systems. Specifications are included for the following elements: (1) Carbon treatment system. (2) Site development - grading and placement. (3) Building details - walls, floors, etc. (4) Structural details - steel and foundations. (5) Mechanical - Plumbing and pipes. (6) Electrical. Volume II contains cost estimates and design calculations. Design calculations.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 16, 1982
- Accession Number
- ADA296756