Wastewater Characterization Survey, Charlotte Air National Guard Base, North Carolina.
Abstract
Personnel from the Armstrong Laboratory Water Quality Branch conducted a wastewater characterization survey for the 145th TAC Clinic, Charlotte Air National Guard Base, North Carolina, from 1-9 March 1994. The scope of the survey was to sample waste-water throughout the base to determine significant pollutant concentrations exist in the wastwater discharge, and how much is coming onto the base from the commercial operations located adjacent to the base. The base currently has very stringent permit levels and the three effluent sampling locations indicated that the sanitary discharge does exceed these levels. The parameters that exceed these limits are; metals, BOD, and Total Suspended Solids. These constituents are at levels typical of sanitary sewage, and the permit levels should be renegotiated. The base also ask that we evaluate the Geographically Separated Unit (GSU) located at Badin NC. The sanitary did not appear unusual for the operations conducted there however the potable water did contain some chlorinated solvents. (AN)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1995
- Accession Number
- ADA297233
Entities
People
- Christopher A. Williston
- Doris A. Hemenway
Organizations
- Armstrong Laboratory