Rocky Mountain Arsenal, Sanitary Sewer, Interim Response Action, Draft Implementation Plan, Volume 1.

Abstract

The primary objective of this interim response action is to prevent the potential spread of contamination via the sanitary sewer system. The IRA will consist of (1) construction of a new sanitary sewer and (2) sealing of the existing sewer in the north plants and south plants areas along with the interceptor line in section 36. Sections of this draft implementation document include: (1) Procedures for sealing the existing sewer lines with concrete. (2) Schedule of closure events. (3) Discussion of ARAR's. (4) Health and safety plan for closure of existing lines. (5) Specifications and plans for the new sanitary sewer. (6) Health and safety plan for the new sewer project. (AN)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1990
Accession Number
ADA297817

Entities

Organizations

  • Weston Solutions (United States)

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Alkenes
  • Cardiac Arrhythmias
  • Chemical Synthesis
  • Chemistry
  • Health Services
  • Medical Personnel
  • Organic Chemistry

Readers

  • Environmental Remediation and Restoration.
  • Software Engineering